USDA Rural Development Logos  Committed to the future of rural communities.  

                                  NEBRASKA        

                                                                                                                                                                                                                                                                                                                               

Home    

State Director

Contact Us

Rural Housing   

Community Facilities  


Rural Business

Rural Utilities   

Cooperatives  

Energy    

Rural Community Development Initiative


Technical Assistance   

Architectural, Engineering & Environmental 

Administrative

Mediation   

News     

Available Funds             

Homes For Sale

Other Resources    

Forms    

Formas en Espaņol    
 

Engineering Resources


Lagoon

The purpose of this web page is to provide current, useful engineeringinformation

to applicants, consulting engineers and agency staff.  


Documents in PDF format require that Adobe Acrobat Reader be installed on your system in order to read the files.   Adobe Acrobat Reader can be downloaded for free.


Engineering Required Under The Rural Utilities Service Water And Waste Disposal Projects:

bullet

Preliminary Engineering Report

bullet

Engineering Contracts

bullet

Property Docket

bullet

Design Standards

bullet

Construction Contracts


Preliminary Engineering Report

bullet

Common Preapplication:  In Nebraska, the EPA's State Revolving Loan Fund, HUD's Community Development Block Grant and USDA's Water & Waste Disposal Loans/Grants have a common preapplication process.  A copy of the Preapplication and Preliminary Engineering Report Guide are at this link.

bullet

Life Cycle Analysis Guide:  Guide on how to complete life cycle analysis to compare alternatives.

Back To Top

 


Engineering Contracts

There are two preapproved engineering agreements available.  USDA has worked with the Engineers Joint Contract Document Council (EJCDC) to develop a set of documents with Federal requirements included.  Please use the EJCDC 1997 or EJCDC 2002 engineering agreements.  Otherwise contact the State Engineer for more information.

  1. EJCDC E-510 (2002):  This agreement is also acceptable for WWD projects.  It shall be used in accordance with RD Bulletin 1780

     RD Bulletin 1780-26:  Guide on using the EJCDC E-510.

  1. EJCDC 1910-1-FA (1997):  This agreement is acceptable however, it is out of print and can only be used if purchased prior to 2002. 

     RD Bulletin 1780-26 (1997):  Guide on using the 1910-1-FA.

    Back To Top


Property Docket

The property docket should start when the application is approved and completed before the plans and specifications are complete.

 

bullet

Property Docket Guide:  Guide on what is required to complete the property docket.  This must be completed after obligation and before bidding.

bullet

RD 442-20:  Property Docket Form, Right-of-Way Easement-Sample Easement.

bullet

RD 442-21:  Property Docket Form, Right-of-Way Certificate--Owner's Responsibility.

bullet

RD 442-22:  Property Docket Form, Opinion of Counsel Relative to Rights-of-Way--Attorney's Responsibility.

bullet

RD 1927-09:  Property Docket Form, Preliminary Title Opinion--Attorney's Responsibility.

bullet

RD 1927-10:  Property Docket Form, Final Title Opinion--Attorney's Responsibility.

Back To Top

 


Design Standards

bullet

RD Instructions 1780:  The design standards and project development regulations are in Section 18 of these instructions.  Plans and specifications shall be submitted to the USDA Rural Development Engineer for review of these standards.

bullet

RD Instruction 1792:  To meet seismic requirements all buildings must be designed according to 1997 Uniform Building Code or the 1995 ASCE 7 Standard.  This should be noted on the front sheet of the plans or use Form 1792-C NE.

Back To Top

 


Water and Waste Disposal Construction Contracts

USDA Rural Development is required to have the Office of General Counsel (OGC) approve all construction contracts.  There are three OGC preapproved contracts.
1. & 2.      Engineers Joint Contract Document Council (EJCDC) Funding Agency Edition (Both the 1997 and 2002 versions are acceptable):
 Guides are available for consultants on how to use the EJCDC construction contract documents.  The FA edition can be purchased from the organizations mentioned at this link. All the following EJCDC forms should be purchased and used according to the Bulletin's Attachments. There are some forms unique to USDA Rural Development please download them from the links that follow. 

RD Bulletin 1780-26 (1997) and RD Bulletin 1780-26 (2002)

Advertise for Bids:  Follow Bulletin's Attachment 4.

Instructions to Bidders:  EJCDC 1910-12(96) or C-200(02)

Bid Form:  EJCDC 1910-18(96) or C-410(02)

 Bid Bond:  EJCDC 1910-28-C(96) or C-430(02)
 Notice of Award:  EJCDC 1910-22(96) or C-510(02)

Agreement:  EJCDC 1910-8-A-1-FA(97) or C-521(02)

Performance Bond:  EJCDC 1910-28-A(96) or C-610(02)

Payment Bond:  EJCDC 1910-28-B(96) or C-615(02)

Notice to Proceed:  EJCDC 1910-23(96) or C-550(02)

Equal Opportunity Employment:  Certification that the contractor is in compliance with EEO laws for contracts over $10,000.

Form AD 1048:  Certification that the contractor is not debarred from doing federal projects over $25,000.

Disclosure of Lobbying Activities:  Certification that lobbying activities of the contractor are legal for contracts over $100,000.

General Conditions:  EJCDC 1910-8-FA(97) or C-710(02)

Supplemental General Conditions: EJCDC 1910-8-FA(97) or C-800(02)

Certificate of Owner's Attorney:  EJCDC 1910-8-FA Exhibit GC-A or C-710(02) Exhibit GC-A

Pay Estimate:  EJCDC 1910-8-E or C-620(02)

Change Order:  EJCDC 1910-8-B or C-941(02)

Construction Sign:  This is the Temporary construction sign layout.

 

Back To Top

  1. USDA Rural Development (RD) Form 1924-6 Short Form Construction Contract:  Permission from the USDA Rural Development Engineer must be obtained before using this short form. These are for contracts under $100,000.

bullet

Agreement & General Conditions:  Form RD 1924-06

bullet

Contractor's Lien Waiver:  Form RD 1924-09

bullet

Performance and Payment Bonds:  Attachment B to Form RD 1924-06

bullet

Subcontractor's Lien Waiver:  Form RD 1924-10

bullet

Supplemental Conditions:  Attachment A to Form RD 1924-06

bullet

Equal Opportunity Employment:  Form RD 400-6 required if contract is over $10,000.

bullet

Debarment:  Form AD-1048 required if contract is over $25,000.

Back To Top


For Assistance...Call or email the State Engineer.

For general engineering information, visit: http://www.usda.gov/rus/water/ees/englib/index.htm.  This web site also contains additional resources including an extensive downloadable library of Federal environmental regulations, laws, administrative notices, and guides.

 

Back To Top

Home     State Director     Contact Us     Rural Housing     Community Facilities   
Rural Business     Rural Utilities     Cooperatives     Energy    
Rural Community Development Initiative
Technical Assistance     Architectural, Engineering & Environmental     Administrative     Mediation     News      Available Funds  

Homes For Sale      Other Resources     Forms     Formas en Espaņol    
 

Last Updated:  07/13/09

 [ USDA Rural Development Home ] 2007 Farm Bill ] [ USDA Policy Statements] FirstGov ]   Policies and Links ] [ Contact Webmaster ]