Environmental Impact Statements
In accordance with 7 CFR 1794.25, Proposals normally requiring an Environmental Impact Statement, the following list includes the Environmental Impact Statements prepared or are under preparation for agency consideration. The links below provide electronic copies of all related Federal Register notices and EIS documentation.
Southern Montana Electric Cooperative, Inc.
SME proposes to construct and operate a 250 MW coal-fired electric generation facility at one of two sites near Great Falls, Montana. Construction of the proposal will require the construction of new electric transmission lines that will interconnect with the Great Falls Substation and the Great Falls to Broadview 230-kV electric transmission line.
Draft Environmental Impact Statement - Individual Sections
|
|
|